{"id":1987,"date":"2026-07-29T14:00:00","date_gmt":"2026-07-29T06:00:00","guid":{"rendered":"https:\/\/shenhengglobal.com\/blog\/6kv-dry-type-transformer-rfq-template\/"},"modified":"2026-07-29T14:00:00","modified_gmt":"2026-07-29T06:00:00","slug":"6kv-dry-type-transformer-rfq-template","status":"publish","type":"post","link":"https:\/\/shenhengglobal.com\/tr\/blog\/6kv-dry-type-transformer-rfq-template\/","title":{"rendered":"6kV Kuru Tip Transformat\u00f6r RFQ's\u00fcnde Al\u0131c\u0131lar\u0131n Yer Vermesi Gerekenler"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\">de\u011ferlendiren al\u0131c\u0131lar <strong>6kv dry type transformer<\/strong> for industrial feeders, commercial buildings, or compact substations need a structured RFQ before comparing quotations. Catalog labels alone rarely capture insulation class, cooling, enclosure, or documentation depth.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">This RFQ template helps EPC and facility teams align voltage class, duty, site conditions, and factory documents with the approved single-line diagram. Use it as a procurement checklist\u2014not as a substitute for project-specific engineering approval.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Project planning overview for 6kv dry type transformer\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/07\/1.-3-Phase-Cast-Resin-Dry-Type-Transformer.webp\" \/><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">\u0130\u00e7indekiler<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#Part-1.-Why-this-topic-matters-in-MV-LV-projects\">B\u00f6l\u00fcm 1. Bu konu AG-OG projelerinde neden \u00f6nemlidir?<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-2.-Key-specification-inputs\">B\u00f6l\u00fcm 2. Ana teknik \u00f6zellik girdileri<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-3.-Application-and-operating-boundaries\">B\u00f6l\u00fcm 3. Uygulama ve \u00e7al\u0131\u015fma s\u0131n\u0131rlar\u0131<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-4.-Documentation-and-RFQ-checklist\">B\u00f6l\u00fcm 4. Belgelendirme ve RFQ kontrol listesi<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-5.-Installation-,-testing-,-or-maintenance-notes\">B\u00f6l\u00fcm 5. Kurulum, test veya bak\u0131m notlar\u0131<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-6.-Product-recommendation-and-Fit-Boundary\">B\u00f6l\u00fcm 6. \u00dcr\u00fcn \u00f6nerisi ve Uyum S\u0131n\u0131r\u0131<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-7.-Common-buyer-mistakes\">B\u00f6l\u00fcm 7. Yayg\u0131n al\u0131c\u0131 hatalar\u0131<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-1.-Why-this-topic-matters-in-MV-LV-projects\">B\u00f6l\u00fcm 1. Bu konu AG-OG projelerinde neden \u00f6nemlidir?<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">6kV distribution upgrades fail quietly when procurement teams treat product names as fully engineered designs. At the MV-LV boundary, cable sizing, fault level, relay settings, and enclosure ratings must match the approved single-line diagram.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For a 6kv dry type transformer, the purchase order should reference measurable parameters\u2014rated voltage, kVA, impedance, insulation level, cooling class, IP\/enclosure, and required tests\u2014rather than marketing adjectives alone.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Kamu bilgilerini \u015furadan \u00e7apraz kontrol et: <a href=\"https:\/\/shenhengglobal.com\/tr\/\">Shenheng Power<\/a> ve son limitleri elektrik\/su da\u011f\u0131t\u0131m \u015firketiniz veya dan\u0131\u015fman m\u00fchendisiniz ile do\u011frulay\u0131n.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-2.-Key-specification-inputs\">B\u00f6l\u00fcm 2. Ana teknik \u00f6zellik girdileri<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Teklifleri normalle\u015ftirmeden \u00f6nce bu girdileri kilitleyin:<\/p>\n<div class=\"b2b-table-scroll\" role=\"region\" aria-label=\"Kayd\u0131r\u0131labilir veri tablosu\" tabindex=\"0\" style=\"width:100%;max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;margin:0 0 18px\">\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Girdi<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Neden \u00f6nemli<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Tipik kaynak<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Primary \/ secondary voltage<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Equipment class and clearances<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tek hat \u015femas\u0131<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Rated kVA and duty cycle<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Termal tasar\u0131m temeli<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00c7al\u0131\u015fmay\u0131 Y\u00fckle<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Vekt\u00f6r grubu ve kademeler<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Topraklama ve voltaj reg\u00fclasyonu<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Utility \/ plant standard<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Impedance and short-circuit withstand<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Protection and bracing<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Ar\u0131za analizi<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Ambient, altitude, and ventilation<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Derating and cooling class<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u015eaha veri formu<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Enclosure \/ IP and accessories<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Indoor layout and maintenance<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Sivil ve operasyon ekipleri<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Technical review of 6kv dry type transformer parameters\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/07\/4.-3-Phase-Cast-Resin-Dry-Type-Transformer.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\">Sivil, koruma ve devreye alma ekiplerinin paralel olarak \u00e7al\u0131\u015fabilmesi i\u00e7in fabrika test raporlar\u0131n\u0131 ve vaziyet plan\u0131 \u00e7izimlerini erken isteyin.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-3.-Application-and-operating-boundaries\">B\u00f6l\u00fcm 3. Uygulama ve \u00e7al\u0131\u015fma s\u0131n\u0131rlar\u0131<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Indoor occupied buildings often favor cast resin dry type assemblies for fire risk and maintenance access, while outdoor feeders may need weatherproof enclosures or a different transformer family.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Harmonic-rich loads, frequent switching, or dusty\/corrosive atmospheres may require additional study. Record measured conditions when drives, furnaces, or welding loads dominate the profile.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Altitude and average ambient temperature influence derating and fan requirements. State elevation, room ventilation, and maintenance clearances in every RFQ.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-4.-Documentation-and-RFQ-checklist\">B\u00f6l\u00fcm 4. Belgelendirme ve RFQ kontrol listesi<\/h2>\n<div class=\"b2b-table-scroll\" role=\"region\" aria-label=\"Kayd\u0131r\u0131labilir veri tablosu\" tabindex=\"0\" style=\"width:100%;max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;margin:0 0 18px\">\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Belge \/ \u00d6\u011fe<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Ama\u00e7<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Ne zaman talep edilmeli<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tip veya rutin test raporu<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Derecelendirmeleri ve kay\u0131plar\u0131 do\u011frulay\u0131n<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Sat\u0131n alma sipari\u015finden \u00f6nce<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">GA drawing and foundation \/ pad load<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u0130n\u015faat ve kald\u0131rma tasar\u0131m\u0131<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tasar\u0131m a\u015famas\u0131<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Wiring \/ single-line and terminal arrangement<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Fesih ve koruma<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Sevkiyattan \u00f6nce<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Temperature monitoring and fan control details<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Alarm and trip logic<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tasar\u0131m a\u015famas\u0131<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u0130\u015fletme ve bak\u0131m k\u0131lavuzu<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Saha e\u011fitimi<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Devir teslim<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Yedek par\u00e7a listesi<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Fans, sensors, gaskets<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">S\u00f6zle\u015fme m\u00fczakeresi<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Devreye alma kontrol listesi<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Oran, polarite, izolasyon testleri<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Enerjilendirmeden \u00f6nce<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p style=\"margin:0 0 16px;line-height:1.7\">Attach this table to RFQs so vendors return comparable technical packages for the same 6kv dry type transformer scope.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-5.-Installation-,-testing-,-or-maintenance-notes\">B\u00f6l\u00fcm 5. Kurulum, test veya bak\u0131m notlar\u0131<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Montaj kalitesi, genellikle teklif edilen ilk maliyetteki k\u00fc\u00e7\u00fck farklardan ziyade uzun vadeli g\u00fcvenilirli\u011fi belirler. Topraklamay\u0131, kablo b\u00fck\u00fclme yar\u0131\u00e7ap\u0131n\u0131, tork de\u011ferlerini ve etiket verilerini onayl\u0131 proje ile kar\u015f\u0131la\u015ft\u0131rarak do\u011frulay\u0131n.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Before energization, plan ratio tests, insulation resistance checks, functional protection tests, and thermal monitoring baselines for dry type rooms.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Maintenance access should be designed into the layout: filter and fan clearance, temperature sensor access, and safe approach distances around live terminals.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-6.-Product-recommendation-and-Fit-Boundary\">B\u00f6l\u00fcm 6. \u00dcr\u00fcn \u00f6nerisi ve Uyum S\u0131n\u0131r\u0131<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">For many 6kv dry type transformer applications, Shenheng Power publishes a relevant catalog starting point at <a href=\"https:\/\/shenhengglobal.com\/tr\/product\/6kv-10kv-cast-resin-three-phase-dry-type-transformer\/\">6kV\/10kV cast resin dry type transformer<\/a>.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"6kV\/10kV cast resin dry type transformer for engineering review\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/07\/df2a8fbaa90f42f2a1e772cd6f83991b.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Uygunluk s\u0131n\u0131r\u0131:<\/strong> This recommendation supports typical indoor distribution and industrial scopes documented on the product page. It is <strong>de\u011fil<\/strong> ola\u011fand\u0131\u015f\u0131 ar\u0131za seviyeleri, a\u015f\u0131r\u0131 rak\u0131mlar veya ulusal \u015febeke kurallar\u0131 ge\u00e7erli oldu\u011funda projeye \u00f6zel \u00e7al\u0131\u015fmalar\u0131n bir ikamesi.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">\u00c7al\u0131\u015fman\u0131z farkl\u0131 bir kVA, voltaj kombinasyonu veya anahtarlama d\u00fczenine i\u015faret ediyorsa, daha kapsaml\u0131 olan\u0131 inceleyin <a href=\"https:\/\/shenhengglobal.com\/tr\/dry-type-transformer\/\">kuru tip trafo kategorisi<\/a> ve \u00e7al\u0131\u015fma girdilerini \u015furadan g\u00f6nderin: <a href=\"https:\/\/shenhengglobal.com\/tr\/contact-us\/\">Shenheng Power ile \u0130leti\u015fime Ge\u00e7in<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-7.-Common-buyer-mistakes\">B\u00f6l\u00fcm 7. Yayg\u0131n al\u0131c\u0131 hatalar\u0131<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Ayn\u0131 test raporu temelinde ve referans s\u0131cakl\u0131klar\u0131nda olmayan tekliflerin kar\u015f\u0131la\u015ft\u0131r\u0131lmas\u0131.<\/li>\n<li style=\"margin:0 0 8px\">Omitting altitude, ambient, ventilation, or enclosure requirements from the RFQ.<\/li>\n<li style=\"margin:0 0 8px\">Bak\u0131m eri\u015fimini ve yedek par\u00e7a tedarik s\u00fcrelerini g\u00f6z ard\u0131 ederek sadece ilk maliyete g\u00f6re ekipman se\u00e7mek.<\/li>\n<li style=\"margin:0 0 8px\">Onaylanan tasar\u0131mla uyumlu hale getirilmeden \u00f6nce koruma ayarlar\u0131n\u0131n ve etiket verilerinin enerjilendirilmesi.<\/li>\n<li style=\"margin:0 0 8px\">Destekleyici \u00e7izimler olmaks\u0131z\u0131n genel pazarlama iddialar\u0131n\u0131 faydal\u0131 model ba\u015fvurular\u0131na kopyalamak.<\/li>\n<\/ul>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"FAQ\">SSS<\/h2>\n<h3 style=\"margin:28px 0 12px\">Al\u0131c\u0131lar bir RFQ'da ilk olarak neyi belirtmelidir?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Start with approved primary\/secondary voltage, kVA, vector group, environmental conditions, enclosure\/cooling needs, and the test documentation required at factory release and site handover.<\/p>\n<h3 style=\"margin:28px 0 12px\">Gerilim s\u0131n\u0131f\u0131 ve vekt\u00f6r grubu se\u00e7imi nas\u0131l etkiler?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">\u0130zolasyon seviyesini, topraklama felsefesini ve kademe gereksinimlerini tan\u0131mlarlar. Uyu\u015fmazl\u0131klar, da\u011f\u0131t\u0131m \u015firketi onay\u0131n\u0131 veya koruma koordinasyonunu geciktirebilir.<\/p>\n<h3 style=\"margin:28px 0 12px\">Enerji verilmeden \u00f6nce hangi testler istenmelidir?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">At minimum, plan ratio, polarity, insulation resistance, and functional protection checks; add thermography or fan\/control functional tests where the design requires them.<\/p>\n<h3 style=\"margin:28px 0 12px\">\u0130\u00e7 ve d\u0131\u015f mekan gereksinimleri tasar\u0131m\u0131 nas\u0131l de\u011fi\u015ftirir?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Indoor projects emphasize fire risk, ventilation, and noise, while outdoor or harsh rooms emphasize enclosure rating, corrosion, and clearance for live work.<\/p>\n<h3 style=\"margin:28px 0 12px\">Fabrika sevk\u0131yat\u0131na hangi belgeler e\u015flik etmelidir?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Sat\u0131n alma sipari\u015fi revizyonuna uygun test raporlar\u0131n\u0131, GA (genel yerle\u015fim) \u00e7izimlerini, kablolama \u015femalar\u0131n\u0131, k\u0131lavuzlar\u0131 ve yedek par\u00e7a listelerini talep edin.<\/p>\n<h3 style=\"margin:28px 0 12px\">M\u00fchendisler da\u011f\u0131t\u0131m \u015febekesi ba\u011flant\u0131 ekibine ne zaman dan\u0131\u015fmal\u0131d\u0131r?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Ba\u011flant\u0131 anla\u015fmas\u0131nda veya \u015febeke y\u00f6netmeli\u011fi kontrol listesinde yer alan kademe aral\u0131\u011f\u0131 kilitleme, koruma felsefesi ve \u00f6l\u00e7\u00fcm gereksinimlerinden \u00f6nce.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"References\">Kaynak\u00e7a<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/publication\/5998\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60076-1 g\u00fc\u00e7 transformat\u00f6rleri \u2014 genel<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/publication\/6143\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61439-1 al\u00e7ak gerilim anahtarlama d\u00fczeni ve kontrol d\u00fczeni tertibatlar\u0131<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE standartlar\u0131 portal\u0131<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Use this 6kV dry type transformer RFQ template to lock voltage, kVA, vector group, enclosure, cooling, tests, and drawing packages before comparing EPC bids.<\/p>","protected":false},"author":1,"featured_media":1621,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1987","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"_links":{"self":[{"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/posts\/1987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/comments?post=1987"}],"version-history":[{"count":0,"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/posts\/1987\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/media\/1621"}],"wp:attachment":[{"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/media?parent=1987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/categories?post=1987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shenhengglobal.com\/tr\/wp-json\/wp\/v2\/tags?post=1987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}