{"id":2007,"date":"2026-07-24T14:00:00","date_gmt":"2026-07-24T06:00:00","guid":{"rendered":"https:\/\/shenhengglobal.com\/blog\/padmount-transformer-vs-compact-substation\/"},"modified":"2026-07-24T14:00:00","modified_gmt":"2026-07-24T06:00:00","slug":"padmount-transformer-vs-compact-substation","status":"publish","type":"post","link":"https:\/\/shenhengglobal.com\/pt\/blog\/padmount-transformer-vs-compact-substation\/","title":{"rendered":"When to Choose a Padmount Transformer Over a Compact Substation"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\">Buyers comparing a <strong>padmount transformer<\/strong> with a compact outdoor substation need a practical way to separate equipment scope, civil interface, and documentation before quotations look interchangeable.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">This guide summarizes decision steps used by EPC teams and facility engineers when they decide whether a stand-alone padmount transformer is enough, or whether a factory-assembled compact substation better matches switching, LV distribution, and schedule constraints. Use it as a procurement checklist\u2014not as a substitute for project-specific engineering approval.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Project planning overview for padmount transformer selection\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/06\/4.-11KV-33KV-YB-Series-Compact-Outdoor-Electrical-Substation.webp\" \/><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">Conte\u00fado<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#Part-1.-Why-this-topic-matters-in-MV-LV-projects\">Parte 1. Porque \u00e9 que este tema importa em projetos de MT-BT<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-2.-Key-specification-inputs\">Parte 2. Principais dados de especifica\u00e7\u00e3o<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-3.-Application-and-operating-boundaries\">Parte 3. \u00c2mbito de aplica\u00e7\u00e3o e limites de funcionamento<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-4.-Documentation-and-RFQ-checklist\">Parte 4. Lista de verifica\u00e7\u00e3o de documenta\u00e7\u00e3o e RFQ<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-5.-Installation-,-testing-,-or-maintenance-notes\">Parte 5. Notas de instala\u00e7\u00e3o, teste ou manuten\u00e7\u00e3o<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-6.-Product-recommendation-and-Fit-Boundary\">Parte 6. Recomenda\u00e7\u00e3o de produto e Limite de Adequa\u00e7\u00e3o<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-7.-Common-buyer-mistakes\">Parte 7. Erros comuns dos compradores<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-1.-Why-this-topic-matters-in-MV-LV-projects\">Parte 1. Porque \u00e9 que este tema importa em projetos de MT-BT<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Distribution upgrades fail quietly when procurement teams treat catalog labels as fully engineered designs. A padmount transformer and a compact substation can both serve outdoor MV-LV conversion, yet they rarely deliver the same switching scope, cable interface, or handover package.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For padmount transformer purchases, the order should reference measurable parameters\u2014voltage class, kVA, impedance, vector group, enclosure rating, and required tests\u2014rather than marketing adjectives alone. If the single-line diagram also needs MV switching and LV distribution in one outdoor bay, a compact package may reduce site assembly risk.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Cruzamento de informa\u00e7\u00f5es p\u00fablicas sobre <a href=\"https:\/\/shenhengglobal.com\/pt\/\">Shenheng Power<\/a> e confirme os limites finais com a sua empresa de servi\u00e7os p\u00fablicos ou engenheiro consultor.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-2.-Key-specification-inputs\">Parte 2. Principais dados de especifica\u00e7\u00e3o<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Bloqueie estas entradas antes de normalizar as licita\u00e7\u00f5es:<\/p>\n<div class=\"b2b-table-scroll\" role=\"region\" aria-label=\"tabela de dados com deslocamento\" tabindex=\"0\" style=\"width:100%;max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;margin:0 0 18px\">\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Entrada<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Porque \u00e9 que isso importa<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Fonte t\u00edpica<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tens\u00e3o estipulada e n\u00edvel de isolamento<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Classe de equipamento e folga<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Diagrama unifilar<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Corrente nominal \/ kVA<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Base de projeto t\u00e9rmico<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Estudo de carga<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Switching and protection scope<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Padmount-only vs packaged MV\/LV bay<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Protection study<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Grupo vetorial e tomadas<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Liga\u00e7\u00e3o \u00e0 terra e regula\u00e7\u00e3o de tens\u00e3o<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Requisitos de servi\u00e7os p\u00fablicos<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Ambiente e altitude<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Redu\u00e7\u00e3o de pot\u00eancia e arrefecimento<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Ficha de dados do local<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Civil pad \/ cable basement interface<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Foundation and duct bank design<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Civil drawings<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Technical review of padmount transformer and compact substation parameters\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/06\/5.-11KV-33KV-YB-Series-Compact-Outdoor-Electrical-Substation.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\">Solicite os relat\u00f3rios de ensaios de f\u00e1brica e os desenhos de conjunto (outline drawings) antecipadamente para que as equipas de civil, protec\u00e7\u00e3o e comissionamento possam trabalhar em paralelo.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-3.-Application-and-operating-boundaries\">Parte 3. \u00c2mbito de aplica\u00e7\u00e3o e limites de funcionamento<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">A padmount transformer is commonly specified when the primary need is outdoor conversion on a concrete pad, with MV switching and LV boards supplied separately. It often fits residential feeders, light commercial sites, and utility laterals where the switching scheme is already defined elsewhere on the network.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">A compact outdoor substation is typically preferred when the project needs a factory-integrated combination of MV switchgear, transformer, and LV distribution with a defined enclosure interface. That package can help industrial parks, renewable collection points, and schedule-driven EPC jobs that want fewer field interfaces.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Compare operating boundaries on at least four axes: switching scope, civil footprint, maintenance access, and cable entry direction. Harmonic-rich loads, corrosive atmospheres, or high altitude still require derating studies for either option.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For broader package-versus-built-on-site context, see <a href=\"https:\/\/shenhengglobal.com\/pt\/blog\/power-substation-vs-prefabricated-substation-key-differences-benefits-and-applications\/\">Power Substation vs Prefabricated Substation<\/a>. For transformer-only oil-immersed selection notes, review <a href=\"https:\/\/shenhengglobal.com\/pt\/blog\/how-to-choose-the-right-oil-immersed-transformer-a-buyers-guide\/\">How to Choose the Right Oil-Immersed Transformer<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-4.-Documentation-and-RFQ-checklist\">Parte 4. Lista de verifica\u00e7\u00e3o de documenta\u00e7\u00e3o e RFQ<\/h2>\n<div class=\"b2b-table-scroll\" role=\"region\" aria-label=\"tabela de dados com deslocamento\" tabindex=\"0\" style=\"width:100%;max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;margin:0 0 18px\">\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Documento \/ item<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Prop\u00f3sito<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Quando solicitar<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Relat\u00f3rio de ensaio de tipo ou de s\u00e9rie<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Verificar classifica\u00e7\u00f5es e perdas<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Antes da ordem de compra<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Desenho de conjunto (GA) e carga de funda\u00e7\u00e3o<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Projeto civil e de eleva\u00e7\u00e3o<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Fase de conce\u00e7\u00e3o<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Esquema el\u00e9trico \/ esquema unifilar<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Rescis\u00e3o e prote\u00e7\u00e3o<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Antes do envio<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Manual de opera\u00e7\u00e3o e manuten\u00e7\u00e3o<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Forma\u00e7\u00e3o no local<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Passagem de testemunho<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Lista de pe\u00e7as sobresselentes<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Casquilhos, juntas, sensores<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Negocia\u00e7\u00e3o de contratos<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Lista de verifica\u00e7\u00e3o de comissionamento<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Ensaios de rela\u00e7\u00e3o, polaridade e isolamento<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Antes da energiza\u00e7\u00e3o<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p style=\"margin:0 0 16px;line-height:1.7\">Attach this table to RFQs so vendors return comparable technical packages for both padmount transformer and compact substation options.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-5.-Installation-,-testing-,-or-maintenance-notes\">Parte 5. Notas de instala\u00e7\u00e3o, teste ou manuten\u00e7\u00e3o<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Installation quality often determines long-term reliability more than small differences in quoted first cost. Confirm grounding, cable bending radius, torque values, and nameplate data against the approved design for whichever package you select.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Before energization, plan ratio tests, insulation resistance checks, functional protection tests, and\u2014where applicable\u2014oil sampling or thermal monitoring baselines. Compact packages also need enclosure door interlocks and LV feeder labeling checked against the approved drawing revision.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Maintenance access should be designed into the layout: oil sampling ports for liquid-filled padmount units, and clearances for MV and LV compartments inside compact outdoor enclosures.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-6.-Product-recommendation-and-Fit-Boundary\">Parte 6. Recomenda\u00e7\u00e3o de produto e Limite de Adequa\u00e7\u00e3o<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">When the comparison points to a factory-assembled outdoor bay rather than a stand-alone padmount transformer, Shenheng Power publishes a relevant catalog starting point at <a href=\"https:\/\/shenhengglobal.com\/pt\/product\/11kv-33kv-yb-series-compact-outdoor-electrical-substation\/\">subesta\u00e7\u00e3o el\u00e9trica compacta exterior de 11kV\/33kV<\/a>.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"subesta\u00e7\u00e3o el\u00e9trica compacta exterior de 11kV\/33kV para revis\u00e3o de engenharia\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/06\/6.-11KV-33KV-YB-Series-Compact-Outdoor-Electrical-Substation.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Ajustar limite:<\/strong> This recommendation supports typical distribution and industrial scopes documented on the product page when MV switchgear, transformer, and LV distribution belong in one outdoor package. It is <strong>n\u00e3o<\/strong> a substitute for a stand-alone padmount transformer when the approved single-line diagram only requires conversion hardware, and it is <strong>n\u00e3o<\/strong> um substituto para estudos espec\u00edficos de projetos quando se aplicam n\u00edveis de falta invulgares, extremos de altitude ou regras de concession\u00e1rias nacionais.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Se o seu estudo apontar para um kVA, uma combina\u00e7\u00e3o de tens\u00e3o ou um esquema de aparelhagem diferentes, reveja o mais amplo <a href=\"https:\/\/shenhengglobal.com\/pt\/prefabricated-substation\/\">categoria de subesta\u00e7\u00e3o pr\u00e9-fabricada<\/a> e submeter os dados do estudo atrav\u00e9s de <a href=\"https:\/\/shenhengglobal.com\/pt\/contact-us\/\">Contactar a Shenheng Power<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-7.-Common-buyer-mistakes\">Parte 7. Erros comuns dos compradores<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Comparing a padmount transformer quotation with a compact substation quotation without aligning switching and LV scope.<\/li>\n<li style=\"margin:0 0 8px\">Omitir os requisitos de altitude, ambiente ou inv\u00f3lucro do RFQ.<\/li>\n<li style=\"margin:0 0 8px\">Selecting equipment solely on first cost while ignoring civil pad, cable basement, and spare lead times.<\/li>\n<li style=\"margin:0 0 8px\">Energizar antes de os par\u00e2metros de prote\u00e7\u00e3o e os dados da placa de identifica\u00e7\u00e3o serem reconciliados com o projeto aprovado.<\/li>\n<li style=\"margin:0 0 8px\">Copiar argumentos de marketing gen\u00e9ricos para candidaturas a utilidade sem desenhos de apoio.<\/li>\n<\/ul>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"FAQ\">FAQ<\/h2>\n<h3 style=\"margin:28px 0 12px\">What is the difference between a padmount transformer and a compact substation?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">A padmount transformer is typically a sealed outdoor distribution unit on a concrete pad. A compact substation usually packages MV switchgear, transformer, and LV distribution in one outdoor enclosure.<\/p>\n<h3 style=\"margin:28px 0 12px\">When should buyers choose a padmount transformer alone?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Choose a stand-alone padmount transformer when the site mainly needs MV-LV conversion and switching or LV boards are already specified as separate equipment.<\/p>\n<h3 style=\"margin:28px 0 12px\">What switching and LV functions does a compact substation typically include?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Many compact outdoor packages integrate incoming\/feeder MV switching with LV distribution around the transformer. Confirm the exact single-line diagram before comparing bids.<\/p>\n<h3 style=\"margin:28px 0 12px\">What civil and cable interfaces differ between the two packages?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Padmount units emphasize pad size, clearances, and primary\/secondary cable loops. Compact substations add enclosure footprint, basement or trench interfaces, and multi-compartment cable entry planning.<\/p>\n<h3 style=\"margin:28px 0 12px\">What documents should accompany factory shipment for either option?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Solicitar relat\u00f3rios de ensaio, desenhos gerais (GA), esquemas el\u00e9tricos, manuais e listas de pe\u00e7as sobresselentes alinhados com a revis\u00e3o da nota de encomenda.<\/p>\n<h3 style=\"margin:28px 0 12px\">Quando devem os engenheiros consultar a equipa de interliga\u00e7\u00e3o \u00e0 rede p\u00fablica?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Antes de fixar o intervalo de regula\u00e7\u00e3o (*tap*), a filosofia de prote\u00e7\u00e3o e os requisitos de contagem que constam do acordo de interliga\u00e7\u00e3o ou da lista de verifica\u00e7\u00e3o do c\u00f3digo de rede.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"References\">Refer\u00eancias<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/publication\/5998\" rel=\"nofollow noopener\" target=\"_blank\">transformadores de pot\u00eancia IEC 60076-1 \u2014 geral<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/publication\/6143\" rel=\"nofollow noopener\" target=\"_blank\">conjuntos de aparelhagem de baixa tens\u00e3o IEC 61439-1<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE standards portal for distribution transformer requirements<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Compare padmount transformer and compact substation options by footprint, switching scope, civil interface, and RFQ inputs for utility and industrial buyers.<\/p>","protected":false},"author":1,"featured_media":1421,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2007","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"_links":{"self":[{"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/posts\/2007","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/comments?post=2007"}],"version-history":[{"count":0,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/posts\/2007\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/media\/1421"}],"wp:attachment":[{"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/media?parent=2007"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/categories?post=2007"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/tags?post=2007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}