{"id":1987,"date":"2026-07-29T14:00:00","date_gmt":"2026-07-29T06:00:00","guid":{"rendered":"https:\/\/shenhengglobal.com\/blog\/6kv-dry-type-transformer-rfq-template\/"},"modified":"2026-07-29T14:00:00","modified_gmt":"2026-07-29T06:00:00","slug":"6kv-dry-type-transformer-rfq-template","status":"publish","type":"post","link":"https:\/\/shenhengglobal.com\/pt\/blog\/6kv-dry-type-transformer-rfq-template\/","title":{"rendered":"O que os Compradores Devem Incluir num Pedido de Cota\u00e7\u00e3o (RFQ) para um Transformador a Seco de 6kV"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\">Compradores a avaliar um <strong>6kv dry type transformer<\/strong> for industrial feeders, commercial buildings, or compact substations need a structured RFQ before comparing quotations. Catalog labels alone rarely capture insulation class, cooling, enclosure, or documentation depth.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">This RFQ template helps EPC and facility teams align voltage class, duty, site conditions, and factory documents with the approved single-line diagram. Use it as a procurement checklist\u2014not as a substitute for project-specific engineering approval.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Project planning overview for 6kv dry type transformer\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/07\/1.-3-Phase-Cast-Resin-Dry-Type-Transformer.webp\" \/><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">Conte\u00fado<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#Part-1.-Why-this-topic-matters-in-MV-LV-projects\">Parte 1. Porque \u00e9 que este tema importa em projetos de MT-BT<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-2.-Key-specification-inputs\">Parte 2. Principais dados de especifica\u00e7\u00e3o<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-3.-Application-and-operating-boundaries\">Parte 3. \u00c2mbito de aplica\u00e7\u00e3o e limites de funcionamento<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-4.-Documentation-and-RFQ-checklist\">Parte 4. Lista de verifica\u00e7\u00e3o de documenta\u00e7\u00e3o e RFQ<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-5.-Installation-,-testing-,-or-maintenance-notes\">Parte 5. Notas de instala\u00e7\u00e3o, teste ou manuten\u00e7\u00e3o<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-6.-Product-recommendation-and-Fit-Boundary\">Parte 6. Recomenda\u00e7\u00e3o de produto e Limite de Adequa\u00e7\u00e3o<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-7.-Common-buyer-mistakes\">Parte 7. Erros comuns dos compradores<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-1.-Why-this-topic-matters-in-MV-LV-projects\">Parte 1. Porque \u00e9 que este tema importa em projetos de MT-BT<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">6kV distribution upgrades fail quietly when procurement teams treat product names as fully engineered designs. At the MV-LV boundary, cable sizing, fault level, relay settings, and enclosure ratings must match the approved single-line diagram.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For a 6kv dry type transformer, the purchase order should reference measurable parameters\u2014rated voltage, kVA, impedance, insulation level, cooling class, IP\/enclosure, and required tests\u2014rather than marketing adjectives alone.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Cruzamento de informa\u00e7\u00f5es p\u00fablicas sobre <a href=\"https:\/\/shenhengglobal.com\/pt\/\">Shenheng Power<\/a> e confirme os limites finais com a sua empresa de servi\u00e7os p\u00fablicos ou engenheiro consultor.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-2.-Key-specification-inputs\">Parte 2. Principais dados de especifica\u00e7\u00e3o<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Bloqueie estas entradas antes de normalizar as licita\u00e7\u00f5es:<\/p>\n<div class=\"b2b-table-scroll\" role=\"region\" aria-label=\"tabela de dados com deslocamento\" tabindex=\"0\" style=\"width:100%;max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;margin:0 0 18px\">\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Entrada<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Porque \u00e9 que isso importa<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Fonte t\u00edpica<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Primary \/ secondary voltage<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Equipment class and clearances<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Diagrama unifilar<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Rated kVA and duty cycle<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Base de projeto t\u00e9rmico<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Estudo de carga<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Grupo vetorial e tomadas<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Liga\u00e7\u00e3o \u00e0 terra e regula\u00e7\u00e3o de tens\u00e3o<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Utility \/ plant standard<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Impedance and short-circuit withstand<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Protection and bracing<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Estudo de faltas<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Ambient, altitude, and ventilation<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Derating and cooling class<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Ficha de dados do local<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Enclosure \/ IP and accessories<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Indoor layout and maintenance<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Equipas de constru\u00e7\u00e3o civil e opera\u00e7\u00f5es<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Technical review of 6kv dry type transformer parameters\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/07\/4.-3-Phase-Cast-Resin-Dry-Type-Transformer.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\">Solicite os relat\u00f3rios de ensaios de f\u00e1brica e os desenhos de conjunto (outline drawings) antecipadamente para que as equipas de civil, protec\u00e7\u00e3o e comissionamento possam trabalhar em paralelo.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-3.-Application-and-operating-boundaries\">Parte 3. \u00c2mbito de aplica\u00e7\u00e3o e limites de funcionamento<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Indoor occupied buildings often favor cast resin dry type assemblies for fire risk and maintenance access, while outdoor feeders may need weatherproof enclosures or a different transformer family.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Harmonic-rich loads, frequent switching, or dusty\/corrosive atmospheres may require additional study. Record measured conditions when drives, furnaces, or welding loads dominate the profile.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Altitude and average ambient temperature influence derating and fan requirements. State elevation, room ventilation, and maintenance clearances in every RFQ.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-4.-Documentation-and-RFQ-checklist\">Parte 4. Lista de verifica\u00e7\u00e3o de documenta\u00e7\u00e3o e RFQ<\/h2>\n<div class=\"b2b-table-scroll\" role=\"region\" aria-label=\"tabela de dados com deslocamento\" tabindex=\"0\" style=\"width:100%;max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;margin:0 0 18px\">\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Documento \/ item<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Prop\u00f3sito<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Quando solicitar<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Relat\u00f3rio de ensaio de tipo ou de s\u00e9rie<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Verificar classifica\u00e7\u00f5es e perdas<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Antes da ordem de compra<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">GA drawing and foundation \/ pad load<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Projeto civil e de eleva\u00e7\u00e3o<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Fase de conce\u00e7\u00e3o<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Wiring \/ single-line and terminal arrangement<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Rescis\u00e3o e prote\u00e7\u00e3o<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Antes do envio<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Temperature monitoring and fan control details<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Alarm and trip logic<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Fase de conce\u00e7\u00e3o<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Manual de opera\u00e7\u00e3o e manuten\u00e7\u00e3o<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Forma\u00e7\u00e3o no local<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Passagem de testemunho<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Lista de pe\u00e7as sobresselentes<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Fans, sensors, gaskets<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Negocia\u00e7\u00e3o de contratos<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Lista de verifica\u00e7\u00e3o de comissionamento<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Ensaios de rela\u00e7\u00e3o, polaridade e isolamento<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Antes da energiza\u00e7\u00e3o<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p style=\"margin:0 0 16px;line-height:1.7\">Attach this table to RFQs so vendors return comparable technical packages for the same 6kv dry type transformer scope.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-5.-Installation-,-testing-,-or-maintenance-notes\">Parte 5. Notas de instala\u00e7\u00e3o, teste ou manuten\u00e7\u00e3o<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">A qualidade da instala\u00e7\u00e3o determina frequentemente a fiabilidade a longo prazo mais do que pequenas diferen\u00e7as no custo inicial or\u00e7amentado. Confirme a liga\u00e7\u00e3o \u00e0 terra, o raio de curvatura dos cabos, os valores de bin\u00e1rio de aperto e os dados da placa de caracter\u00edsticas em rela\u00e7\u00e3o ao projeto aprovado.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Before energization, plan ratio tests, insulation resistance checks, functional protection tests, and thermal monitoring baselines for dry type rooms.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Maintenance access should be designed into the layout: filter and fan clearance, temperature sensor access, and safe approach distances around live terminals.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-6.-Product-recommendation-and-Fit-Boundary\">Parte 6. Recomenda\u00e7\u00e3o de produto e Limite de Adequa\u00e7\u00e3o<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">For many 6kv dry type transformer applications, Shenheng Power publishes a relevant catalog starting point at <a href=\"https:\/\/shenhengglobal.com\/pt\/product\/6kv-10kv-cast-resin-three-phase-dry-type-transformer\/\">6kV\/10kV cast resin dry type transformer<\/a>.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"6kV\/10kV cast resin dry type transformer for engineering review\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/07\/df2a8fbaa90f42f2a1e772cd6f83991b.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Ajustar limite:<\/strong> This recommendation supports typical indoor distribution and industrial scopes documented on the product page. It is <strong>n\u00e3o<\/strong> um substituto para estudos espec\u00edficos de projetos quando se aplicam n\u00edveis de falta invulgares, extremos de altitude ou regras de concession\u00e1rias nacionais.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Se o seu estudo apontar para um kVA, uma combina\u00e7\u00e3o de tens\u00e3o ou um esquema de aparelhagem diferentes, reveja o mais amplo <a href=\"https:\/\/shenhengglobal.com\/pt\/dry-type-transformer\/\">categoria de transformador a seco<\/a> e submeter os dados do estudo atrav\u00e9s de <a href=\"https:\/\/shenhengglobal.com\/pt\/contact-us\/\">Contactar a Shenheng Power<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-7.-Common-buyer-mistakes\">Parte 7. Erros comuns dos compradores<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Comparar propostas sem a mesma base de relat\u00f3rio de ensaio e temperaturas de refer\u00eancia.<\/li>\n<li style=\"margin:0 0 8px\">Omitting altitude, ambient, ventilation, or enclosure requirements from the RFQ.<\/li>\n<li style=\"margin:0 0 8px\">Selecionar equipamento apenas com base no custo inicial, ignorando o acesso para manuten\u00e7\u00e3o e os prazos de entrega de pe\u00e7as sobresselentes.<\/li>\n<li style=\"margin:0 0 8px\">Energizar antes de os par\u00e2metros de prote\u00e7\u00e3o e os dados da placa de identifica\u00e7\u00e3o serem reconciliados com o projeto aprovado.<\/li>\n<li style=\"margin:0 0 8px\">Copiar argumentos de marketing gen\u00e9ricos para candidaturas a utilidade sem desenhos de apoio.<\/li>\n<\/ul>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"FAQ\">FAQ<\/h2>\n<h3 style=\"margin:28px 0 12px\">O que devem os compradores especificar primeiro num RFQ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Start with approved primary\/secondary voltage, kVA, vector group, environmental conditions, enclosure\/cooling needs, and the test documentation required at factory release and site handover.<\/p>\n<h3 style=\"margin:28px 0 12px\">Como \u00e9 que a classe de tens\u00e3o e o grupo vetorial afetam a sele\u00e7\u00e3o?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Elas definem o n\u00edvel de isolamento, a filosofia de liga\u00e7\u00e3o \u00e0 terra e os requisitos de tomadas. Desfasamentos podem atrasar a aprova\u00e7\u00e3o da concession\u00e1ria ou a coordena\u00e7\u00e3o da prote\u00e7\u00e3o.<\/p>\n<h3 style=\"margin:28px 0 12px\">Que ensaios devem ser solicitados antes da energiza\u00e7\u00e3o?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">At minimum, plan ratio, polarity, insulation resistance, and functional protection checks; add thermography or fan\/control functional tests where the design requires them.<\/p>\n<h3 style=\"margin:28px 0 12px\">Como \u00e9 que os requisitos de interior e exterior alteram o design?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Indoor projects emphasize fire risk, ventilation, and noise, while outdoor or harsh rooms emphasize enclosure rating, corrosion, and clearance for live work.<\/p>\n<h3 style=\"margin:28px 0 12px\">Que documentos devem acompanhar a expedi\u00e7\u00e3o de f\u00e1brica?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Solicitar relat\u00f3rios de ensaio, desenhos gerais (GA), esquemas el\u00e9tricos, manuais e listas de pe\u00e7as sobresselentes alinhados com a revis\u00e3o da nota de encomenda.<\/p>\n<h3 style=\"margin:28px 0 12px\">Quando devem os engenheiros consultar a equipa de interliga\u00e7\u00e3o \u00e0 rede p\u00fablica?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Antes de fixar o intervalo de regula\u00e7\u00e3o (*tap*), a filosofia de prote\u00e7\u00e3o e os requisitos de contagem que constam do acordo de interliga\u00e7\u00e3o ou da lista de verifica\u00e7\u00e3o do c\u00f3digo de rede.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"References\">Refer\u00eancias<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/publication\/5998\" rel=\"nofollow noopener\" target=\"_blank\">transformadores de pot\u00eancia IEC 60076-1 \u2014 geral<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/publication\/6143\" rel=\"nofollow noopener\" target=\"_blank\">conjuntos de aparelhagem de baixa tens\u00e3o IEC 61439-1<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/\" rel=\"nofollow noopener\" target=\"_blank\">Portal de normas do IEEE<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Use this 6kV dry type transformer RFQ template to lock voltage, kVA, vector group, enclosure, cooling, tests, and drawing packages before comparing EPC bids.<\/p>","protected":false},"author":1,"featured_media":1621,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1987","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"_links":{"self":[{"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/posts\/1987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/comments?post=1987"}],"version-history":[{"count":0,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/posts\/1987\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/media\/1621"}],"wp:attachment":[{"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/media?parent=1987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/categories?post=1987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shenhengglobal.com\/pt\/wp-json\/wp\/v2\/tags?post=1987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}