{"id":2591,"date":"2026-10-08T13:00:00","date_gmt":"2026-10-08T05:00:00","guid":{"rendered":"https:\/\/shenhengglobal.com\/?p=2591"},"modified":"2026-10-08T10:07:36","modified_gmt":"2026-10-08T02:07:36","slug":"switchgear-factory-acceptance-test-checklist","status":"publish","type":"post","link":"https:\/\/shenhengglobal.com\/ja\/blog\/switchgear-factory-acceptance-test-checklist\/","title":{"rendered":"Switchgear Factory Acceptance Test Checklist"},"content":{"rendered":"<p>A switchgear factory acceptance test (FAT) checks the manufactured equipment against the approved specification before shipment. It combines document review, construction inspection, applicable routine-test evidence and agreed functional demonstrations. A useful checklist identifies the exact panel, acceptance basis, witness responsibility and evidence required for each item. FAT does not prove that transport, site assembly, cable installation or final protection coordination will be satisfactory; those interfaces need their own site acceptance and commissioning checks.<\/p>\n<p>This guide focuses on medium-voltage metal-enclosed switchgear. Adapt it to the actual technology, contract, standards and supplied configuration. It is a buyer&#8217;s inspection framework, not a generic instruction for applying high voltage to every device in a panel.<\/p>\n<h2>Agree the scope before the witness visit<\/h2>\n<p>The inspection and test plan should distinguish document review, hold points, witness points and records submitted for review. It should state what the buyer will observe and what the manufacturer completes independently. Agree the notice period, sample selection where permitted and the handling of a missed witness point.<\/p>\n<p>Identify the equipment covered by each report. A project may contain incomers, feeders, metering panels, bus couplers and different breaker duties. A generic report bearing the project name does not establish that every supplied panel was inspected or tested as required.<\/p>\n<p>The <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/63466\" rel=\"noopener nofollow\" target=\"_blank\">IEC 62271-200 catalogue scope<\/a> addresses AC metal-enclosed switchgear above 1 kV up to and including 52 kV. The applicable edition and contractual amendments must be agreed. Its catalogue description identifies scope; the actual standard and specification determine the detailed requirements.<\/p>\n<h2>Separate type-test evidence from routine tests<\/h2>\n<p>Type-test evidence supports a design or defined configuration. Routine tests concern the manufactured equipment according to the applicable requirements. A witnessed FAT may include routine tests and additional contractual demonstrations, but it does not mean every design test is repeated on every panel.<\/p>\n<p>Review whether supplied design evidence applies to the offered construction, ratings, components and arrangements. Record deviations for technical assessment. An internal-arc report for a different enclosure or accessibility arrangement cannot simply be treated as proof for every version carrying the same product family name.<\/p>\n<p>The <a href=\"https:\/\/shenhengglobal.com\/blog\/mv-switchgear-short-circuit-rating\/\">short-circuit rating guide<\/a> helps distinguish the ratings that must align with the project study. The <a href=\"https:\/\/shenhengglobal.com\/blog\/switchgear-internal-arc-classification\/\">internal arc classification guide<\/a> explains another important boundary: classification evidence and installation conditions must be checked against the actual offer.<\/p>\n<h2>Review the approved documents first<\/h2>\n<p>Collect the approved single-line diagram, general arrangement, panel schedule, wiring diagrams, component list, ratings and protection philosophy. The drawing revision on the factory floor should match the revision used by the inspector. Resolve changes before executing a functional demonstration against an obsolete scheme.<\/p>\n<p>Check nameplates, panel identifiers and serial numbers. Confirm that the records can be traced from the report to the physical equipment and later to the installed location. If a report covers multiple panels, the identification list should be explicit.<\/p>\n<p>Review manufacturer documentation for major components and any agreed design-test evidence. Record exceptions and exclusions. A missing document is an open acceptance item, even if the panel looks complete and the operating mechanism moves correctly.<\/p>\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" alt=\"Closed switchgear cabinets beside an isolated factory inspection desk\" height=\"1024\" loading=\"lazy\" class=\"wp-image-2574\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-1.png\" style=\"width:100%;height:auto\" width=\"1536\" srcset=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-1.png 1536w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-1-300x200.png 300w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-1-1024x683.png 1024w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-1-768x512.png 768w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-1-18x12.png 18w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-1-1000x667.png 1000w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><figcaption>Record routine-test evidence and agreed functional demonstrations. Reference-based illustration.<\/figcaption><\/figure>\n<h2>Inspect the manufactured arrangement<\/h2>\n<p>Compare dimensions, panel sequence, accessible compartments, cable interfaces and transport sections with the approved arrangement. Confirm that the supplied configuration leaves the agreed installation and maintenance access. Do not infer the final site clearance from a cabinet standing alone in the factory.<\/p>\n<p>Inspect visible workmanship, labels, enclosure condition and the documented earthing arrangement through the authorized inspection procedure. Confirm that the specified major components are present and identifiable. Any substitution needs the agreed approval process rather than a verbal explanation during the witness visit.<\/p>\n<p>Check auxiliary supply ratings, control devices, terminal identification, heaters and monitoring options where included. These details can affect the site integration even when the main circuit ratings are correct. Record the actual delivered option, not a feature shown in a marketing photograph.<\/p>\n<h2>Use a panel-specific acceptance checklist<\/h2>\n<p>The table provides a starting structure. Detailed test parameters and limits must come from the agreed standard, manufacturer instructions and approved inspection plan.<\/p>\n<div class=\"sh-table-wrap\" style=\"overflow-x:auto;max-width:100%;margin:24px 0\">\n<table style=\"width:100%;border-collapse:collapse;min-width:640px\">\n<thead>\n<tr>\n<th style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">FAT area<\/th>\n<th style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">What to verify<\/th>\n<th style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Acceptance basis<\/th>\n<th style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Record to retain<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Identity and drawings<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Panel, serial number, function and revision match<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Approved panel schedule and drawings<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Signed identity list and revision register<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Main ratings<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Voltage, current and short-circuit duty align<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Contract and approved study requirements<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Nameplate record and technical schedule<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Design evidence<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Applicable reports cover the offered arrangement<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Agreed standard and accepted deviations<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Traceable report references and review outcome<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Construction<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Components, interfaces and workmanship match<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Approved bill of materials and arrangement<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Inspection checklist and deviation photographs<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Routine electrical tests<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Required tests cover the supplied equipment<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Applicable routine-test procedure<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Instrument output and panel-specific results<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Mechanical operation<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Permitted operating states function correctly<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Equipment instructions and interlock matrix<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Witnessed operation record<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Protection and control<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Inputs, outputs, alarms and trip paths match<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Approved logic and wiring diagrams<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Functional test sheets and configuration version<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Shipment release<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Blocking items closed and documents complete<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Contractual release criteria<\/td>\n<td style=\"padding:12px;border:1px solid #ddd;vertical-align:top\">Signed release or explicit hold record<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>Witness electrical tests through approved procedures<\/h2>\n<p>The test plan should state the measurement scope, equipment configuration, instruments, applicable limits and precautions for connected components. Insulation measurements, dielectric tests and circuit resistance checks answer different questions. They should not be grouped under an unexplained \u201celectrical test passed\u201d label.<\/p>\n<p>Some components may need a specified treatment before a particular test. The manufacturer&#8217;s procedure establishes that configuration and its restoration. A checklist that applies one test voltage indiscriminately to every connected electronic device can damage equipment and does not demonstrate sound acceptance practice.<\/p>\n<p>Instrument identification and calibration status should be recorded where required. Preserve raw results and any retest sequence. If a failure is corrected, retain the original result, corrective action and accepted retest so the buyer can understand what changed.<\/p>\n<p>The <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32982\" rel=\"noopener nofollow\" target=\"_blank\">IEC 62271-1 catalogue page<\/a> provides common-specification context for high-voltage switchgear and controlgear. Confirm the edition and applicable product requirements rather than assuming one catalogue page supplies all test limits.<\/p>\n<h2>Test interlocks as a matrix of allowed and blocked states<\/h2>\n<p>Agree the intended operating states from the actual design. Test both permitted actions and prohibited operations using the manufacturer-approved method. A demonstration that only shows successful closing leaves important interlock functions unverified.<\/p>\n<p>Record the equipment state, command, expected outcome, actual outcome and witness. Include the applicable local and remote controls, breaker position indications and earthing arrangements. The <a href=\"https:\/\/shenhengglobal.com\/blog\/switchgear-earthing-switch-interlocks\/\">earthing switch interlock guide<\/a> helps prepare these questions without replacing the panel&#8217;s actual logic matrix.<\/p>\n<p>For withdrawable equipment, the approved procedure may include relevant service, test and disconnected positions. For fixed equipment, the applicable operating arrangement differs. The <a href=\"https:\/\/shenhengglobal.com\/blog\/fixed-vs-withdrawable-switchgear\/\">fixed versus withdrawable switchgear comparison<\/a> explains why one generic demonstration sequence cannot cover every design.<\/p>\n<h2>Verify protection and control without overstating the outcome<\/h2>\n<p>Factory functional checks should verify the supplied wiring, specified devices, indications, alarms and agreed trip paths. Identify simulated interfaces and unavailable site equipment. A relay output demonstrated at the factory does not prove a remote installed breaker or final supervisory system will operate correctly at site.<\/p>\n<p>Record relay model, firmware where relevant, configuration revision and the settings used for the demonstration. Distinguish temporary test settings from the final approved settings. A contractor should not copy the factory test file into service without the protection engineer&#8217;s approval.<\/p>\n<p>The university video below explains relay testing and commissioning principles. It supports this protection-and-control section, rather than claiming to demonstrate the entire switchgear FAT.<\/p>\n<div class=\"sh-video\" style=\"position:relative;width:100%;aspect-ratio:16\/9\"><iframe allow=\"accelerometer; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen=\"\" loading=\"lazy\" src=\"https:\/\/www.youtube-nocookie.com\/embed\/BQJPiHidDhk\" style=\"position:absolute;width:100%;height:100%;border:0\" title=\"Lecture 39 Testing, Commissioning and Maintenance of Relays-I\"><\/iframe><\/div>\n<p>Further learning: Lecture 39 Testing, Commissioning and Maintenance of Relays-I \u2014 IIT Roorkee July 2018. This educational video supports the topic; it is not a product demonstration or an operating authorization. <a href=\"https:\/\/www.youtube.com\/watch?v=BQJPiHidDhk\" rel=\"noopener nofollow\" target=\"_blank\">Open the video on YouTube<\/a>.<\/p>\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" alt=\"Medium-voltage cabinets in a factory dispatch inspection hall\" height=\"1024\" loading=\"lazy\" class=\"wp-image-2579\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-2.png\" style=\"width:100%;height:auto\" width=\"1536\" srcset=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-2.png 1536w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-2-300x200.png 300w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-2-1024x683.png 1024w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-2-768x512.png 768w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-2-18x12.png 18w, https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/10\/switchgear-factory-acceptance-test-checklist-body-2-1000x667.png 1000w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><figcaption>Close shipment-blocking items and preserve the as-built records. Reference-based illustration.<\/figcaption><\/figure>\n<h2>Manage deviations and release decisions<\/h2>\n<p>Use an itemized list with the panel, requirement, observed deviation, proposed action, owner and closure evidence. Classify which items block shipment and who has authority to accept a concession. A signature on a witness sheet should not quietly become unconditional acceptance of every open issue.<\/p>\n<p>After corrective work, decide which checks need repetition. Replacing a component or altering wiring can affect an earlier accepted result. The retest scope should follow the change, and the final document package should show the as-built arrangement rather than the original plan.<\/p>\n<p>Photographs help identify the issue but do not replace measurements or signed records. Store them with the relevant item reference. A folder of unlabeled cabinet photographs is difficult to use once the equipment has been split into transport sections.<\/p>\n<h2>Prepare shipment and site handover<\/h2>\n<p>Confirm packing, transport restraints, environmental protection, accessory inventory and installation instructions. Record any equipment removed or secured for transport and how it is to be restored. Include lifting and handling documentation appropriate to the supplied arrangement.<\/p>\n<p>The handover package should contain final drawings, routine-test records, applicable design evidence, component manuals, relay configuration details and the closed deviation list. Retain an explicit record of unfinished interfaces that require site verification. The <a href=\"https:\/\/www.netaworld.org\/standards\/ansi-neta-ats\" rel=\"noopener nofollow\" target=\"_blank\">NETA acceptance testing standards page<\/a> provides context for an applicable field acceptance framework; it does not turn the factory witness visit into site commissioning.<\/p>\n<p>When discussing the <a href=\"https:\/\/shenhengglobal.com\/product\/customized-gas-insulated-switchgear-kyn28-12-12kv-24kv-switchgear-system\/\">KYN28 switchgear offer<\/a>, request the actual configuration and proposed inspection plan. Confirm the insulation system and test evidence in the offer. Product naming or a photograph cannot establish compliance, internal-arc classification or the scope of completed tests.<\/p>\n<p>Before shipment release, reconcile every transport section with the final panel list and document package. Confirm that the buyer knows which records accompany the shipment and which are delivered separately. If a contractual concession remains open, include its limitations and agreed closure point in the handover. This prevents the site team from interpreting a factory release as evidence that an unresolved interface has already been accepted. The release record should make the remaining work visible and assign it to the responsible party.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>Is FAT the same as a type test?<\/h3>\n<p>No. FAT is an agreed factory acceptance process. It can include review of applicable design-test evidence, routine tests on the supplied equipment and contractual functional demonstrations. Its exact scope must be defined in the inspection plan.<\/p>\n<h3>Does a completed FAT remove the need for site acceptance?<\/h3>\n<p>No. Transport, assembly, installed cables, earthing, final protection settings and external interfaces require site-specific verification. Factory records provide evidence and a baseline, but do not prove the final installation.<\/p>\n<h3>Should every test be repeated after a factory correction?<\/h3>\n<p>The responsible engineer should define the retest scope from the change and its effects. Retain the original finding, corrective action and relevant retest evidence instead of replacing the history with an unexplained pass.<\/p>\n<h3>What should prevent shipment release?<\/h3>\n<p>The contract and approved inspection plan define blocking conditions. Unresolved safety, functional, rating or documentation issues should be assessed by the authorized acceptance team and explicitly closed or formally dispositioned before release.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Is FAT the same as a type test?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. FAT is an agreed factory acceptance process. It can include review of applicable design-test evidence, routine tests on the supplied equipment and contractual functional demonstrations. Its exact scope must be defined in the inspection plan.\"}}, {\"@type\": \"Question\", \"name\": \"Does a completed FAT remove the need for site acceptance?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. Transport, assembly, installed cables, earthing, final protection settings and external interfaces require site-specific verification. Factory records provide evidence and a baseline, but do not prove the final installation.\"}}, {\"@type\": \"Question\", \"name\": \"Should every test be repeated after a factory correction?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The responsible engineer should define the retest scope from the change and its effects. Retain the original finding, corrective action and relevant retest evidence instead of replacing the history with an unexplained pass.\"}}, {\"@type\": \"Question\", \"name\": \"What should prevent shipment release?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The contract and approved inspection plan define blocking conditions. Unresolved safety, functional, rating or documentation issues should be assessed by the authorized acceptance team and explicitly closed or formally dispositioned before release.\"}}]}<\/script><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"BreadcrumbList\", \"itemListElement\": [{\"@type\": \"ListItem\", \"position\": 1, \"name\": \"Home\", \"item\": \"https:\/\/shenhengglobal.com\/\"}, {\"@type\": \"ListItem\", \"position\": 2, \"name\": \"Blog\", \"item\": \"https:\/\/shenhengglobal.com\/blog\/\"}, {\"@type\": \"ListItem\", \"position\": 3, \"name\": \"Switchgear Factory Acceptance Test Checklist\", \"item\": \"https:\/\/shenhengglobal.com\/blog\/switchgear-factory-acceptance-test-checklist\/\"}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Use a switchgear FAT checklist for drawings, ratings, routine tests, interlocks and control checks. Define evidence and shipment release before the witness visit.<\/p>","protected":false},"author":4,"featured_media":2572,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[138],"class_list":["post-2591","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-switchgear-factory-acceptance-test"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"_links":{"self":[{"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/posts\/2591","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/comments?post=2591"}],"version-history":[{"count":1,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/posts\/2591\/revisions"}],"predecessor-version":[{"id":2596,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/posts\/2591\/revisions\/2596"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/media\/2572"}],"wp:attachment":[{"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/media?parent=2591"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/categories?post=2591"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/tags?post=2591"}],"curies":[{"name":"\u304a\u75b2\u308c\u69d8\u3067\u3057\u305f","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}