{"id":1707,"date":"2026-07-28T14:00:00","date_gmt":"2026-07-28T06:00:00","guid":{"rendered":"https:\/\/shenhengglobal.com\/?p=1707"},"modified":"2026-08-24T17:52:00","modified_gmt":"2026-08-24T09:52:00","slug":"industrial-lv-switchgear-busbar-selection","status":"publish","type":"post","link":"https:\/\/shenhengglobal.com\/ja\/blog\/industrial-lv-switchgear-busbar-selection\/","title":{"rendered":"\u7523\u696d\u7528\u4f4e\u5727\u914d\u96fb\u76e4\u5411\u3051\u6bcd\u7dda\u306e\u9078\u5b9a\u65b9\u6cd5"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\">\u8cfc\u5165\u8005\u306e\u8a55\u4fa1 <strong>industrial lv switchgear<\/strong> for plant feeders, motor control centers, and reactive-power sections need a clear busbar decision path before the assembly drawing is frozen.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">This guide explains how EPC and facility teams align busbar rating, material, bracing, joints, and temperature-rise checks with the approved single-line diagram and fault study. Use it as a procurement checklist\u2014not as a substitute for project-specific engineering approval.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Project overview of industrial LV switchgear busbar planning\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/06\/1.-0.4KV-Low-Voltage-Switchgear-LT-Panel-1.webp\" \/><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Contents\">\u76ee\u6b21<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#Part-1.-Why-busbar-selection-matters-in-industrial-LV-projects\">Part 1. Why busbar selection matters in industrial LV projects<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-2.-Key-busbar-specification-inputs\">Part 2. Key busbar specification inputs<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-3.-Application-and-operating-boundaries\">\u7b2c3\u90e8\uff1a\u9069\u7528\u3068\u52d5\u4f5c\u5883\u754c<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-4.-Documentation-and-RFQ-checklist\">\u30d1\u30fc\u30c84. \u30c9\u30ad\u30e5\u30e1\u30f3\u30c8\u304a\u3088\u3073RFQ\u30c1\u30a7\u30c3\u30af\u30ea\u30b9\u30c8<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-5.-Installation-,-testing-,-or-maintenance-notes\">\u7b2c5\u90e8\uff1a\u8a2d\u7f6e\u3001\u30c6\u30b9\u30c8\u3001\u307e\u305f\u306f\u4fdd\u5b88\u306b\u95a2\u3059\u308b\u6ce8\u610f\u4e8b\u9805<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-6.-Product-recommendation-and-Fit-Boundary\">\u30d1\u30fc\u30c86\uff1a\u5546\u54c1\u306e\u304a\u3059\u3059\u3081\u3068\u30d5\u30a3\u30c3\u30c8\u306e\u5883\u754c\u7dda<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#Part-7.-Common-buyer-mistakes\">\u30d1\u30fc\u30c87\uff1a\u8cb7\u3044\u624b\u304c\u3084\u308a\u304c\u3061\u306a\u9593\u9055\u3044<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#FAQ\">\u3088\u304f\u3042\u308b\u8cea\u554f<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#References\">\u53c2\u8003\u6587\u732e<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-1.-Why-busbar-selection-matters-in-industrial-LV-projects\">Part 1. Why busbar selection matters in industrial LV projects<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">In <strong>industrial lv switchgear<\/strong> assemblies, the busbar system carries continuous current and withstands short-circuit forces between the incoming device and outgoing feeders. Undersized bars, weak bracing, or poorly defined joints show up later as overheating, nuisance trips, or delayed factory acceptance.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Treat busbar selection as a design input, not a catalog afterthought. The purchase order should cite measurable values\u2014rated current, short-time withstand, material, plating, joint method, and required temperature-rise evidence\u2014against the approved study.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For plant context on fixed versus withdrawable arrangements, review the <a href=\"https:\/\/shenhengglobal.com\/ja\/blog\/ggd-vs-mns-lv-switchgear-comparison\/\">GGD vs MNS low voltage switchgear comparison<\/a> before locking the assembly form.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-2.-Key-busbar-specification-inputs\">Part 2. Key busbar specification inputs<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">\u5165\u672d\u3092\u6b63\u898f\u5316\u3059\u308b\u524d\u306b\u3001\u3053\u308c\u3089\u306e\u5165\u529b\u3092\u30ed\u30c3\u30af\u3057\u3066\u304f\u3060\u3055\u3044\uff1a<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u5165\u529b<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u306a\u305c\u305d\u308c\u304c\u91cd\u8981\u306a\u306e\u304b<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u4ee3\u8868\u7684\u306a\u30bd\u30fc\u30b9<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Rated current and diversity<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Thermal sizing of main and distribution bars<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Load study \/ feeder list<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Short-circuit withstand (Icw \/ Ipk)<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Bar cross-section, spacing, and bracing<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u6545\u969c\u89e3\u6790<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Busbar material (Cu \/ Al)<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Conductivity, mass, joint practice, corrosion<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Owner standard \/ RFQ<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Plating and joint method<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Contact resistance and maintenance access<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Assembly drawing notes<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Temperature-rise verification basis<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Comparable quotations and FAT scope<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">IEC 61439 assembly rules<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Enclosure ventilation \/ IP<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Heat dissipation and derating<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Room layout \/ site data<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Industrial LV switchgear cabinet used for busbar interface review\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/07\/1.Three-Phase-Metal-Enclosed-Low-Voltage-Distribution-Cabinet.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\">Request outline drawings that show main horizontal bars, vertical risers, droppers, and joint locations early so civil, cable, and protection teams can work in parallel.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-3.-Application-and-operating-boundaries\">\u7b2c3\u90e8\uff1a\u9069\u7528\u3068\u52d5\u4f5c\u5883\u754c<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Operating context changes acceptable busbar solutions. Continuous high-load feeders often favor copper for thermal margin, while some industrial standards allow aluminum when joint design, plating, and maintenance access are controlled.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Harmonic-rich loads, densely packed compensation sections, and frequent feeder additions increase local heating risk. Record measured ambient temperature, altitude, and ventilation assumptions in every RFQ for industrial lv switchgear projects.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">If motor feeders and feeder arrangement dominate the board, coordinate busbar duty with panel layout inputs using the <a href=\"https:\/\/shenhengglobal.com\/ja\/blog\/ggd-ac-distribution-cabinet-layout-tips\/\">GGD AC distribution cabinet layout tips<\/a> so cable entry, breaker placement, and bar ratings stay aligned.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-4.-Documentation-and-RFQ-checklist\">\u30d1\u30fc\u30c84. \u30c9\u30ad\u30e5\u30e1\u30f3\u30c8\u304a\u3088\u3073RFQ\u30c1\u30a7\u30c3\u30af\u30ea\u30b9\u30c8<\/h2>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u66f8\u985e \/ \u9805\u76ee<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u76ee\u7684<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u7533\u8acb\u306e\u6642\u671f<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Single-line diagram and feeder schedule<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Define continuous and peak bus duties<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Before quotation comparison<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Fault study excerpt<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Confirm short-time withstand and bracing<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u8a2d\u8a08\u30d5\u30a7\u30fc\u30ba<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Busbar material \/ plating note<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Normalize Cu vs Al offers<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">RFQ release<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Temperature-rise or type-test evidence<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Compare thermal performance basis<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u767a\u6ce8\u524d<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">GA drawing with joint locations<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Cable entry and maintenance planning<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Design freeze<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Torque \/ assembly procedure<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Installation quality control<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u51fa\u8377\u524d<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">Attach this table to RFQs so vendors return comparable technical packages for industrial lv switchgear assemblies.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-5.-Installation-,-testing-,-or-maintenance-notes\">\u7b2c5\u90e8\uff1a\u8a2d\u7f6e\u3001\u30c6\u30b9\u30c8\u3001\u307e\u305f\u306f\u4fdd\u5b88\u306b\u95a2\u3059\u308b\u6ce8\u610f\u4e8b\u9805<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Installation quality often determines long-term busbar reliability more than small differences in quoted first cost. Confirm torque values, contact surfaces, phase identification, and clearances against the approved drawing before energization.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Before factory acceptance or site energization, plan insulation resistance checks, functional protection tests, and\u2014where the contract requires\u2014thermography baselines on joints after initial loading.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Maintenance access should be designed into the layout: reachable joint covers, spare bar or connector stock for critical feeders, and clear labeling for future feeder additions. Fault-clearing philosophy for the same assembly family is covered in <a href=\"https:\/\/shenhengglobal.com\/ja\/blog\/low-voltage-switchgear-fault-clearing-basics\/\">low voltage switchgear fault clearing basics<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-6.-Product-recommendation-and-Fit-Boundary\">\u30d1\u30fc\u30c86\uff1a\u5546\u54c1\u306e\u304a\u3059\u3059\u3081\u3068\u30d5\u30a3\u30c3\u30c8\u306e\u5883\u754c\u7dda<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">For many industrial LV switchgear busbar scopes, Shenheng Power publishes a relevant catalog starting point at <a href=\"https:\/\/shenhengglobal.com\/ja\/product\/industrial-lv-power-switchgear-ggd-ggj-mns-low-voltage-metal-enclosed-switchgear\/\">industrial LV metal enclosed switchgear<\/a>.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"industrial LV metal enclosed switchgear for engineering review\" src=\"https:\/\/shenhengglobal.com\/wp-content\/uploads\/2026\/07\/46f83651-b819-4b09-936b-5fb6ddcce443.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>\u5883\u754c\u7dda\u306b\u5408\u308f\u305b\u308b<\/strong> This recommendation supports typical GGD \/ GGJ \/ MNS distribution and industrial scopes documented on the product page. It is <strong>\u3067\u306f\u306a\u3044<\/strong> a substitute for project-specific studies when unusual fault levels, altitude extremes, special plating rules, or national utility requirements apply.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">If your study points to a different arrangement or rating, review the broader <a href=\"https:\/\/shenhengglobal.com\/ja\/low-voltage-switchgear\/\">\u4f4e\u5727\u914d\u96fb\u76e4<\/a> category and submit study inputs through <a href=\"https:\/\/shenhengglobal.com\/ja\/contact-us\/\">\u7533\u8861\u96fb\u529b\u3078\u9023\u7d61\u3059\u308b<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"Part-7.-Common-buyer-mistakes\">\u30d1\u30fc\u30c87\uff1a\u8cb7\u3044\u624b\u304c\u3084\u308a\u304c\u3061\u306a\u9593\u9055\u3044<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Comparing quotations without the same short-circuit and temperature-rise basis.<\/li>\n<li style=\"margin:0 0 8px\">Specifying only ampere rating while omitting material, plating, and joint method.<\/li>\n<li style=\"margin:0 0 8px\">Ignoring ambient temperature, altitude, or enclosure ventilation in the RFQ.<\/li>\n<li style=\"margin:0 0 8px\">Freezing cable entry locations before busbar dropper geometry is confirmed.<\/li>\n<li style=\"margin:0 0 8px\">Adding feeders later without re-checking continuous and short-circuit bus duty.<\/li>\n<\/ul>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"FAQ\">\u3088\u304f\u3042\u308b\u8cea\u554f<\/h2>\n<h3 style=\"margin:28px 0 12px\">What busbar rating inputs belong in an industrial LV switchgear RFQ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Include rated current, diversity assumptions, prospective fault level, material preference, plating\/joint method, enclosure conditions, and the temperature-rise or type-test evidence required for comparison.<\/p>\n<h3 style=\"margin:28px 0 12px\">When should buyers choose copper versus aluminum busbars?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Choose copper when thermal margin, compact geometry, or owner standards prioritize conductivity. Aluminum can be acceptable when joint design, plating, maintenance access, and derating are documented in the approved design.<\/p>\n<h3 style=\"margin:28px 0 12px\">How does short-circuit withstand affect busbar bracing design?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Higher short-time and peak currents increase electrodynamic forces. The bracing, spacing, and support arrangement must match the fault study used for the industrial LV switchgear assembly.<\/p>\n<h3 style=\"margin:28px 0 12px\">What joint and temperature-rise checks matter before factory release?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Confirm joint method, plating, torque procedure, and the agreed temperature-rise verification basis so factory acceptance compares offers on the same thermal evidence.<\/p>\n<h3 style=\"margin:28px 0 12px\">Which drawings and test reports should accompany shipment?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Request GA drawings with joint locations, wiring\/single-line references, assembly or torque procedures, and the agreed routine or type-test documentation aligned to the purchase order revision.<\/p>\n<h3 style=\"margin:28px 0 12px\">When should the design authority re-check busbar selection?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Re-check whenever load growth, feeder additions, fault-level updates, ambient assumptions, or enclosure ventilation changes after the original study.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"References\">\u53c2\u8003\u6587\u732e<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/publication\/6143\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61439-1 low-voltage switchgear assemblies \u2014 general rules<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/publication\/6144\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61439-2 power switchgear and controlgear assemblies<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Buyers evaluating industrial lv switchgear for plant feeders, motor control centers, and reactive-power sections need a clear busbar decision path before the assembly drawing is frozen. This guide explains how EPC and facility teams align busbar rating, material, bracing, joints, and temperature-rise checks with the approved single-line diagram and fault study. Use it as a procurement checklist\u2014not as a substitute for project-specific engineering approval. Contents Part 1. Why busbar selection matters in industrial LV projects Part 2. Key busbar specification inputs Part 3. Application and operating boundaries Part 4. Documentation and RFQ checklist Part 5. Installation, testing, or maintenance notes Part 6. Product recommendation and Fit Boundary Part 7. Common [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1632,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1707","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"_links":{"self":[{"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/posts\/1707","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/comments?post=1707"}],"version-history":[{"count":1,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/posts\/1707\/revisions"}],"predecessor-version":[{"id":1976,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/posts\/1707\/revisions\/1976"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/media\/1632"}],"wp:attachment":[{"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/media?parent=1707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/categories?post=1707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shenhengglobal.com\/ja\/wp-json\/wp\/v2\/tags?post=1707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}